{"page":{"id":302,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://puttly.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-17\">November 17, 2026</time></p>\n<p>Second thoughts happen to everyone. You remember mid-commute that his home course is spelled &#8220;Pines&#8221;, not &#8220;Pine&#8221;. You realise the hoodie should have been a 2XL. Your sister already bought him the same cap. This page explains how to cancel a Puttly order or change it, why the window is short, what we can and cannot change, and how the money comes back when an order is cancelled.</p>\n<section class=\"policy-summary\">\n<h2>Cancelling or changing at a glance</h2>\n<ul>\n<li><strong>Window:</strong> within 24 hours of placing the order.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@puttly.shop\">support@puttly.shop</a> with your order number and the change you need.</li>\n<li><strong>Cost:</strong> nothing. No cancellation fee.</li>\n<li><strong>Refund for a cancelled order:</strong> the full amount, refunded to your original payment method within 7 days of confirming the cancellation.</li>\n<li><strong>After 24 hours:</strong> printing has usually begun, so wait for delivery and use our 60-day returns with a free return label.</li>\n<li><strong>Confirmation:</strong> a change or cancellation is final only once you have our reply saying it is done.</li>\n</ul>\n</section>\n<h2>1. Why the window is 24 hours</h2>\n<p>Every Puttly item is printed to order. Print and pack takes 1–3 business days, and printing can start soon after you check out. Once a name is on a towel or a design is on a tee, it cannot be taken back off. The 24-hour window gives you a fair chance to catch mistakes, while letting us move orders along so gifts arrive on time.</p>\n<p>The window runs from the time your order was placed, shown on your order confirmation email. It is 24 hours of clock time, including nights and weekends. An order placed at 9 p.m. on Saturday can be changed until 9 p.m. on Sunday, but it is wise to write sooner rather than later.</p>\n<h2>2. How to ask for a change or cancellation</h2>\n<ol>\n<li><strong>Find your order number.</strong> It is at the top of your order confirmation email and in <a href=\"/my-account/\">My Account</a> if you checked out with an account.</li>\n<li><strong>Email us.</strong> Write to <a href=\"mailto:support@puttly.shop\">support@puttly.shop</a>, or use <a href=\"/submit-ticket/\">Submit Ticket</a>. A subject such as &#8220;Change: your order number&#8221; or &#8220;Cancel: your order number&#8221; helps it get picked up first.</li>\n<li><strong>Be exact.</strong> Say which item is affected and what it should be. For personal text, type the corrected text in full, exactly as it should print, including capitals and spacing.</li>\n<li><strong>Send from the checkout email if you can.</strong> It helps us match the request to the order quickly and safely.</li>\n<li><strong>Watch for our reply.</strong> We reply within 24 hours on business days. The change or cancellation is done once our reply confirms it.</li>\n</ol>\n<p>Please send one email with everything in it rather than several short ones. When three corrections arrive in three messages, the risk of missing one grows.</p>\n<h3>Your order in its first day</h3>\n<table class=\"policy-table\">\n<caption>What happens between checkout and printing</caption>\n<thead>\n<tr>\n<th scope=\"col\">Moment</th>\n<th scope=\"col\">What you see</th>\n<th scope=\"col\">Can it still change?</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Right after checkout</td>\n<td>Order confirmation email with items, sizes and your text</td>\n<td>Yes, email us</td>\n</tr>\n<tr>\n<td>Later that day</td>\n<td>Order status still shows as being prepared</td>\n<td>Yes, while inside 24 hours of ordering</td>\n</tr>\n<tr>\n<td>Past 24 hours</td>\n<td>Printing has usually begun</td>\n<td>No; use the 60-day returns once it arrives</td>\n</tr>\n<tr>\n<td>Parcel on its way</td>\n<td>Tracking details by email, when tracking is available</td>\n<td>No; contact us about any address issue</td>\n</tr>\n</tbody>\n</table>\n<p>Read your order confirmation email the moment it arrives. It repeats every size, colour and line of personal text exactly as our print partner will receive it, so it is the best single place to catch a slip.</p>\n<h2>3. What we can change within 24 hours</h2>\n<table class=\"policy-table\">\n<caption>Changes that can be requested within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to send us</th>\n<th scope=\"col\">Price effect</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Personal text</td>\n<td>&#8220;Three-Putt Pine GC&#8221; should read &#8220;Three-Putt Pines GC&#8221;</td>\n<td>The corrected text in full, for each item affected</td>\n<td>None, unless a paid optional field is added or removed</td>\n</tr>\n<tr>\n<td>Size</td>\n<td>Hoodie from L to XL</td>\n<td>Item and new size</td>\n<td>2XL–3XL +$2, 4XL–5XL +$4 compared with S–XL</td>\n</tr>\n<tr>\n<td>Colour</td>\n<td>Navy tee to a lighter colour</td>\n<td>Item and new colour</td>\n<td>None</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Missing apartment number</td>\n<td>The full corrected address</td>\n<td>None; shipping stays free in all four countries</td>\n</tr>\n<tr>\n<td>Remove an item</td>\n<td>One cap no longer needed</td>\n<td>Which item to remove</td>\n<td>That item is refunded</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>Gift already bought by someone else</td>\n<td>&#8220;Please cancel&#8221; and your order number</td>\n<td>Full refund</td>\n</tr>\n</tbody>\n</table>\n<h3>When a change costs more or less</h3>\n<p>If a change raises the price, for example moving from XL to 3XL or adding the +$5 tee back line, we tell you the difference first and explain how to pay it. Nothing is charged without your agreement. If a change lowers the price, such as dropping a paid optional field, the difference is refunded to your original payment method within 7 days of our confirmation.</p>\n<h3>Adding items</h3>\n<p>Want to add a matching tumbler to the hoodie you just ordered? The simplest route is a second order. Shipping is free on every order, so there is no penalty for placing two, and your first order keeps its place in the queue.</p>\n<h3>Changes we cannot make</h3>\n<p>Some requests fall outside what an order change can do, even inside 24 hours:</p>\n<ul>\n<li><strong>Shipping to a country we do not serve.</strong> We ship only to the United States, Canada, Australia and New Zealand, so an address change to anywhere else is not possible.</li>\n<li><strong>A design that is not in the shop.</strong> Changes are limited to the options on the product page: the listed colours, sizes S–5XL for adult apparel, and the built-in personalisation fields.</li>\n<li><strong>Text longer than the field allows.</strong> The character limit shown on the product page also applies to corrections.</li>\n<li><strong>A promised arrival date.</strong> We cannot speed an order up or guarantee a date, though we will tell you honestly how timing looks.</li>\n<li><strong>Hat sizes.</strong> Hats are one size with an adjustable back, so there is no hat size to change.</li>\n</ul>\n<h3>Changing the email or name on the order</h3>\n<p>If you typed your email address wrong at checkout, you will not get our emails, so this is worth fixing fast. Write from the address you meant to use, include your order number and the name on the order, and tell us what the email should be. If you mistyped the recipient&#8217;s name on the shipping label, correct it the same way within 24 hours. A correct name on the label helps the parcel reach the right person at a shared address or a busy clubhouse.</p>\n<h2>4. Personal text: the one to double-check</h2>\n<p>We print exactly what you type. There is no proof stage, and the product page shows a live text preview as you type so you can see the finished look before you buy. That means a typo in the order becomes a typo on the item, unless you catch it in time.</p>\n<p>Example: you order a personalised towel and two hours later notice the home course reads &#8220;Bogey Flat Muni&#8221;. Email us with the order number and the corrected text, &#8220;Bogey Flats Muni&#8221;, and we fix it before printing. Because you are well inside 24 hours, there is no charge.</p>\n<p>A few tips before you check out, so you never need this page:</p>\n<ul>\n<li>Copy the course name from the golfer&#8217;s scorecard or the course&#8217;s own sign, not from memory.</li>\n<li>Read the live preview out loud. Missing letters are easier to hear than to see.</li>\n<li>For a foursome order, check each towel or hat line separately. Each personalised item is its own line in the cart.</li>\n<li>Check the character limit shown next to each field. If text is cut short, shorten it yourself so it reads the way you want.</li>\n</ul>\n<h2>5. Cancelling an order and getting your money back</h2>\n<p>Cancelled within 24 hours, an order is refunded in full. That covers the item prices and any paid add-ons. There is no shipping charge to refund, since shipping is free. The full amount is refunded to your original payment method within 7 days of confirming the cancellation, and we email you when it is done. How fast it then shows on your statement depends on your bank or payment provider. The money side is explained in more depth in our <a href=\"/refund-policy/\">Refund Policy</a>.</p>\n<h3>Cancelling part of an order</h3>\n<p>You can cancel some items and keep the rest moving. A retirement gift set of tee, cap and mug can lose the mug and still ship the other two. The cancelled items are refunded within 7 days of our confirmation; the rest continue through printing as normal.</p>\n<h3>Cancelling because of a gift date</h3>\n<p>Ordered a Father&#8217;s Day tee a little late and worried it will miss the day? Count it out: 1–3 business days to print and pack, then 7–14 business days in transit. If that lands after the date and you would rather not give it late, ask us to cancel within 24 hours of ordering and the full amount is refunded within 7 days. Or let it run and give it the following weekend; golfers rarely object to a late tee.</p>\n<h2>6. After 24 hours</h2>\n<p>Once 24 hours have passed, printing has usually started or finished. At that point we can no longer cancel or change the order. You are still covered, though:</p>\n<ul>\n<li><strong>Wait for the parcel.</strong> Let it arrive, even if you no longer want it.</li>\n<li><strong>Start a return.</strong> Every item can be returned within 60 days of delivery, for any reason, with a free return label from us. See our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>.</li>\n<li><strong>Choose your outcome.</strong> A refund issued within 7 days of us receiving the return, or store credit that never expires.</li>\n</ul>\n<p>If you write to us just after the 24-hour mark, tell us anyway. We will be honest about whether the order has already gone to print. We cannot promise a late change, so please do not count on one.</p>\n<h3>Address problems after the window</h3>\n<p>If you realise the address is wrong after 24 hours, email us right away with the correct one. Once the parcel is with the carrier we cannot change the address ourselves, but contact us and we will help work out the next step. Delivery details are on <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a>.</p>\n<h2>7. Real situations, quick answers</h2>\n<h3>&#8220;I ordered the wrong size for my dad.&#8221;</h3>\n<p>Within 24 hours: email us the item and the right size, and we change it. Later: let it arrive, return it on our free label, and order the right size. The <a href=\"/size-guide/\">Size Guide</a> explains how to measure a shirt he already owns.</p>\n<h3>&#8220;Someone else already bought him this exact hat.&#8221;</h3>\n<p>Within 24 hours: ask us to cancel that line. Later: return it within 60 days of delivery for a refund or store credit, which never expires.</p>\n<h3>&#8220;I ordered for the Saturday 7:40 group and forgot Marge.&#8221;</h3>\n<p>Place a second order for Marge&#8217;s item. It will follow its own 1–3 business days of printing and 7–14 business days of transit, so it may arrive a few days after the rest.</p>\n<h3>&#8220;I paid twice by mistake.&#8221;</h3>\n<p>Email us with both order numbers. We cancel the duplicate and refund it in full within 7 days of confirming the cancellation.</p>\n<h2>8. When Puttly cancels an order</h2>\n<p>Very occasionally we may need to cancel an order ourselves, for example if the shipping address is outside the United States, Canada, Australia and New Zealand, if the address cannot be delivered to, or if a payment does not go through properly. If that happens, we email you to explain, and any amount you paid is refunded in full to your original payment method within 7 days. Where it makes sense, we will suggest how to place the order again.</p>\n<h2>9. Contact us</h2>\n<p>Just placed an order and need a change? Email <a href=\"mailto:support@puttly.shop\">support@puttly.shop</a> now, with your order number. We reply within 24 hours on business days. You can check your order&#8217;s status on <a href=\"/order-tracking/\">Order Tracking</a> or find more answers in the <a href=\"/help-center/\">Help Center</a>.</p>\n<p>Puttly, 5125 Live Oak Dr, Smithton, IL 62285, US.</p>\n","visible_characters":10794,"meta_description":"Need to fix a name, size or address? Email us within 24 hours of ordering to change or cancel a Puttly order. Refunds for cancellations follow within 7 days.","parent":null,"published_at":"2026-11-17T00:21:37+00:00","updated_at":"2026-11-17T00:21:37+00:00"}}